Ground Breaking for C-23/C-24 Stormwater Treatment Area to Help Clean Up the Indian River Lagoon

Ground Breaking for C-23/C-24 Stormwater Treatment Area to Help Clean Up the Indian River Lagoon

St.Lucie County, Fl (treasurecoast.com)- On Feb 18 the South Florida Water Management District and the U.S. Army Corps of Engineers, Jacksonville District along with state and local leaders celebrated the groundbreaking of the Indian River Lagoon-South C-23/C-24 Stormwater Treatment Area in St. Lucie County. This marks yet another pivotal moment in helping to protect the St. Lucie River and Indian River Lagoon. With historic support from Governor Ron DeSantis, the State of Florida continues its commitment to advancing Everglades projects that make a difference for the environment and quality of life for people in South Florida.

Ground Breaking for C-23/C-24 Stormwater Treatment Area to Help Clean Up the Indian River Lagoon

Ground Breaking for C-23/C-24 Stormwater Treatment Area to Help Clean Up the Indian River Lagoon

“We are here with our outstanding partners at the South Florida Water Management to celebrate the Groundbreaking for the C-23/24 Stormwater Treatment Area, the first major construction feature of the Indian River Lagoon-South project to address the C-23 and C-24 basins in St Lucie County,” said Col. James Booth, U.S. Army Corps of Engineers Jacksonville District Commander. “This is a watershed moment for us. Three months ago, we completed construction on the C-44 Reservoir and Stormwater Treatment Area Complex, we’re putting C-23/24 components in the ground, and the Indian River Lagoon-South C 23/24 North Reservoir has been fully funded through construction under the Infrastructure Investment and Jobs Act, the largest single investment to date to restore and revitalize the Everglades in Florida. We’ve got incredible momentum right now!”

“We are so delighted to see this project started! Projects like this will turn the tide on the pollution problem in the Indian River Lagoon,” said Larry Williams, the State Supervisor for Ecological Services in Florida, with the U.S. Fish and Wildlife Service. “We all want a healthy environment with abundant fish and wildlife. The C23/24 features will deliver exactly those things.”

“This is an exciting time for St. Lucie County and the entire Treasure Coast as it seems all of our local, state, and federal agencies are all paddling in the same direction when it comes to addressing and funding water quality issues,” said St. Lucie County Commissioner and Erosion Chair Frannie Hutchinson.

“The South Florida Water Management District continually prioritizes improving water quality across South Florida, and today’s C-23/C-24 STA groundbreaking is another pivotal moment to helping protect the St. Lucie River and the Indian River Lagoon,” said Chauncey Goss, Chairman of the South Florida Water Management District. “The State of Florida, under the leadership of Governor Ron DeSantis, will continue its commitment to advancing Everglades projects that make a difference for the environment and the quality of life for people in South Florida. We’re going to keep up our momentum and work in partnership with the Jacksonville District of the U.S. Army Corps of Engineers to expedite Everglades projects.”

The C23/24 Stormwater Treatment Area, or STA, is designed to treat water from the Canal-23 and Canal-24 Basins.

It encompasses more than 2,500 acres which is almost equivalent to the approximately 3,000 acres protected under the North Fork St. Lucie River Aquatic Preserve.

Its purpose is to reduce the sediment, phosphorus, and nitrogen going to the St. Lucie River Estuary and the southern portion of the Indian River Lagoon.

The STA is a component of the Indian River Lagoon-South (IRL-South) project and part of the Comprehensive Everglades Restoration Plan (CERP) which was authorized by Congress in the Water Resources Development Act WRDA) of 2007.

Together, the C-23/24 Basin features are anticipated to:

  • Capture local run-off from the C-23 and C-24 basins, reducing the nutrients flowing to the St. Lucie River Estuary and the southern portion of the Indian River Lagoon
  • Provide valuable open water, wetland, and upland habitat
  • Include thousands of acre-feet of new water storage, and
  • Divert excess water from the basin, helping to rehydrate the floodplain of the north fork of the St. Lucie River and to moderate flows to the estuary and improving salinities.

The C-23/24 Basin Stormwater Treatment Area includes:

  • 2,568 Acres with 4,750 acre-feet of storage
  • A total of 43,900 feet of perimeter levee and 13,200 feet of interior levee
  • 1 two-barrel ungated culvert under CR-613 to connect the western and eastern STA cells
  • 1 three-barrel gated culvert under CR-609 for discharge from the STA
  • 19 individual culverts within the STA
  • A temporary pump station to flow to maintain vegetation prior to the completion of the future North Reservoir An intake structure for the North Reservoir that will run under Sneed Road, and
  • Up to 2 years of operational testing

 

Project Costs

IRL-S Project overall: $4.04 Billion

IRL-S C-44 (all features): $526 Million

IRL-S C-23/C-24 (all features): $1.2 Billion

IRL-S C-23/C-24 Stormwater Treatment Area: $137 Million

 

 

TreasureCoast

TreasureCoast

Share

Post Info

  • Posted 2 years ago

Read More

The Insider's Guide to Florida's Treasure Coast

Subscribe

Receive the latest tips, information, & news!